Safe 98



Monthly Construction and Environmental Update October 2009
October 31, 2009



Escatawpa to Jones Road (8,650’)
• Area stabilized with permanent BMPs.
Jones Road to Walter Tanner Road (10,650’)
• Area stabilized with permanent BMPs.
• Sediment Removal from floodplain at Station 202 (OF 15) is complete. Planting of wetland species remains.
Walter Tanner Road to Wilmer-Georgetown Road (4,186’)
• Area stabilized with permanent BMPs.
Wilmer-Georgetown Road to Glenwood Road (13,617’)
• Area stabilized with permanent BMPs.
Glenwood Road to east end of project (4,964’)
• Area stabilized with permanent BMPs.

Environmental Issues:
• Rain Days: Total of 13 events totaling 4.95 inches for this month.
• No Non-Compliant conditions or Water Quality violations for this month.
• Recent ADEM inspection has identified a few additional areas where sediment remediation is needed. ALDOT working on plans to address sediment remediation in those areas.
• Security fencing has been installed at various locations as noted :
• Gates will be locked and accessible by ALDOT, MAWSS, and Mobile County Sherriff’s Department personnel.
1. Fences with locked gates West of Jones Road and at west end of base and pave project.
2. Fenced and locked East of Jones Road and West of Tanner Road.
3. Fenced and locked East of Tanner Road and West of Wilmer Georgetown Road.
4. Accessible east of Wilmer Georgetown to about station 380 (where mobile home is located) south side of road. Fenced and locked from this point to east of Glenwood Road.
5. Glenwood Road is accessible for houses on south side of road. Fenced and locked from station 452 to Jersey barricades on east end of project (current point of project termination).

• The Mobile County Sherriff’s Department is patrolling the project for security.
• Daily inspections for maintenance on going.
• Contractor has demobilized all equipment from site.




Safe 98 • Copyright © 2008 Inc. All rights reserved.